What drives the cost of an extension.

An extension is a small new building attached to an old one, and the attaching is where most of the surprises live. This guide explains what moves the price of a ground-floor or second-storey extension, what you control, and the mistakes that turn a good idea into a redesign. No figures: your own estimate is free.

Poster: Every price shows its basis, with sample estimate lines and the source of each price

Two jobs in one

The cost factors, and what you control

No figures on purpose. Your own estimate prices each factor for your house and site.
FactorWhy it moves the priceWhat you control
Out or upBuilding up means checking and strengthening the existing structure, removing the roof and adding a stairThe direction, decided with the site and the engineer
The joinDemolition, beams, flashing where roofs meet, floors matched at the same level, services reroutedA design that meets the old house simply
AccessA side passage limits machinery and deliveries; everything takes longer by handWhere the work sits on the block
Existing structureOld footings, walls and drainage may need upgrading to carry or serve the new workAn inspection before you design
Matching materialsBricks, roofing and windows that match cost more than the plainest optionMatch, or a deliberate contrast
Rooms addedWet rooms concentrate plumbing, electrical, tiling and cabinetry; dry rooms are mostly structureWhat the extension is for
OpeningsLarge doors onto the garden are among the dearest elementsNumber, size and performance
Finish levelRuns across every visible surface and fitting in the new rooms, and the old ones you refresh to matchEconomical, Standard, Good or Advanced, then product by product
Living through itMoving out, staging the work or protecting the rooms you keep using all cost time and moneyHow the work is sequenced

Finish levels explained

Common mistakes

Your own figure

Get a free ballpark for your extension.

Suburb, floor area of the new rooms, project type and finish level. We email you a link that opens your free account with the project already filled in.

Project type
Finish level

An estimate, not a quote. We email you a link to create your free account; no card is needed.

Extension questions.

Is building up cheaper than building out?

Not usually, and not always. Up saves the garden but adds engineering, strengthening, roof removal and a stair. Out adds footings and a new floor but leaves the house alone. The estimate prices the quantities of each so you can compare them rather than guess.

Does the estimate include the demolition and the join?

Describe the extension as its own building or storey on the project and the estimate prices its structure, services and finishes. Work on the existing house that you add as quantities is priced too; anything you leave out is listed under what is not in the price, so nothing is silently assumed.

Can I see what the finish level does to the total?

Yes. Re-price after changing it and put the two versions side by side. Every version is kept.

Will builders price the same thing?

Yes, once you approve a Design or Detailed estimate. Every invited builder prices that scope, including the lines you excluded, and you read their responses blind.

Price the extension before you meet a builder.

Free to start. Every line explained.

Start your free estimate