What drives the cost of a bathroom.

A bathroom is small, wet and full of trades. Demolition, plumbing, waterproofing, tiling, electrical, cabinetry and fixtures all happen in a room a few metres across, in a fixed order, each trade waiting on the last. This guide explains what moves a bathroom budget, what you control, and the usual mistakes. No figures: your own estimate is free.

Poster: Know your number before you meet a builder, with a sample estimate summary

A small room with every trade in it

The cost factors, and what you control

No figures on purpose. Your own estimate prices each factor for your bathroom.
FactorWhy it moves the priceWhat you control
LayoutMoving the toilet, shower or basin means new drainage and water runs; the toilet is the dearest to moveKeep the fixtures where they are if you can
WaterproofingLicensed work priced by the area it coversOnly how large the wet areas are; never the quality
TilingSquare metres and the tiler's hours, which rise with small formats, patterns and tiling to the ceilingTile format, extent and pattern
FixturesEach is a priced product; wall-hung and freestanding fixtures add workFinish level, then product by product
VanityCabinetry priced like a kitchen's, plus the basin and benchtopSize, construction and finish
Shower screenFramed, semi-frameless or frameless, by sizeType and size
Ventilation and electricalExhaust ducted to outside, lighting, heating, power pointsWhat you add
The existing roomDemolition, disposal, the floor and walls found beneath, making goodAn inspection; a contingency shown as its own line
Finish levelRuns across tiles, tapware, fixtures, vanity, screen and lightingEconomical, Standard, Good or Advanced, then product by product

Finish levels explained

Common mistakes

Your own figure

Get a free ballpark for your renovation.

Suburb, the floor area you are renovating, project type and finish level. We email you a link that opens your free account with the project already filled in.

Project type
Finish level

An estimate, not a quote. We email you a link to create your free account; no card is needed.

Bathroom questions.

What is the biggest cost in a bathroom?

If the fixtures move, the plumbing. If they stay, usually the tiling and waterproofing, then the fixtures. The estimate prices each as its own lines so you can see your own answer.

Does the estimate include the plumbing and electrical?

Every line prices the material and the trade labour to install it, from trade rates for your locality, with the hours shown. Anything you leave out of the scope is listed under what is not in the price.

Can I see the tiles and tapware before I choose?

Yes. Where the catalogue holds a photo, it appears beside the product and each alternative, so you choose by what it looks like and swap with a reason.

How do I compare a Good and an Advanced bathroom?

Re-price after changing the level and put the two versions side by side. Every version is kept, so the comparison is line by line, not a feeling.